Clean Rooms
Clean Rooms
Clean Rooms
Clean Rooms
Clean Rooms

Clean
Rooms

Nogales, Sonora, Mexico
Medical-Grade Supplies Industry
415,000-foot industrial building2
Engineering Solutions

• Electrical system calculation and design
• Electrical installation verification in accordance with NOM-001-SEDE-2012
• CFE Procedures
• Voice and data distribution system design
• Gas and process supply distribution system (compressed air)

Supply and installation

• Electrical Engineering
• 1200, 400, and 200 Amps distribution boards at 480 and 220 Volts
• Thermomagnetic switches from 15 to 1200 Amps
• Distribution of wiring and electrical outlets for services and production
• 800 KVAR automatic capacitor bank
• CCM System (Motor Control Center)
• Lighting system for production areas, offices, and bathrooms; emergency and exit lighting were included

VOICE AND DATA

• CAT6e UTP cabling
• Connection switch

Gases and processes

• Aluminum tubing with compression fittings, 4” for compressed air distribution
• Pressure control and monitoring pressure gauges
• Sockets and accessories for connecting services
• Vacuum system distribution piping made of 316 stainless steel

Back to projects →
Logo Energía Eficiente DOCA
We design, build, and optimize industrial energy solutions — including electrical, lighting, and automation — with a focus on compliance and efficiency, from beginning to end.